Welcome to Dongying Youjia Petroleum Machinery Co., Ltd.

    中 文  | ENGLISH 

Your present location:Home >> Technical strength >> Technical Services >> Screen pipe Completion

Your present location:Home >> Technical strength >> Technical Services >> Screen pipe Completion
  • Name: Screen pipe Completion
  • ID: 11005
  • Views : 52

Advantages:
The upper casing can hold production pipe string of larger size; higher production capacity meets the design concept for horizontal wells.
Cement job quality is guaranteed and problems of annular pressure and gas channeling are overcome..
Good selectivity; the screen pipe can bring into play the production superiority of horizontal wells; various methods can be taken for the cementing section of casing.
With sufficient effusion area and strength, it has good sand and corrosion control performance.
If the casing above the screen pipe is not cemented, the pump can be run directly for production.

友情链接:    大众彩票   V8彩票找不到了   宝丽棋牌   天荣棋牌首页   乐投彩票